Information Center
Container manufacturer_ Talking about the installation of movable plank house

1. According to the performance characteristics of the movable plank house, it is in a slope shape at an appropriate angle. During the assembly process, the assembly must be carried out according to the appropriate inclination angle. The wallboard shall be cut at an appropriate angle, and the connection of the two wallboards shall be fixed with rivets.

2. As described below, reinforced concrete structure shall be adopted around the movable plank house and partition wall to obtain a firm effect. The frame structure shall be connected to the supporting beams. Before the lower plate hardens, the upper partition wall and the outer wall partition wall should be assembled in place, and then the doors and windows can be assembled.

3. After installation, the water level should also be checked with a level gauge. At the same time, there is no gap between the corner and the edge during the installation of the outer bread edge. Then, rivet it to completely fix the base and the wall.